Interactive Guide
Lifecycle phases
Development and project management
1 Development and project management
1.1 Development and consenting services
1.2 Environmental surveys
1.3 Resource and metocean assessment
1.4 Geological and hydrological surveys
1.5 Engineering and consultancy
1.6 Project management
Manufacturing
2 Manufacturing
2.1 Wind turbine
2.1.1 Turbine nacelle and hub
2.1.2 Turbine blades
2.1.3 Turbine tower
2.1.4 Turbine electrical system
2.2 Cables
2.2.1 Array cables
2.2.2 Export cables
2.3 Fixed foundation
2.4 Floating foundation
2.5 Mooring system (floating only)
2.6 Offshore substation
2.7 Onshore substation
Installation
3 Installation
3.1 Offshore substation
3.2 Offshore cables
3.3 Onshore export cables
3.4 Mooring system (floating only)
3.5 Turbine and foundation installation
3.6 Inbound transport
3.7 Construction port
3.8 Offshore logistics
3.9 Onshore substation
Operations and maintenance
4 Operations and maintenance
4.1 Operations
4.2 Maintenanace
4.3 Major repair
4.4 Offshore vessels and logistics
4.5 OMS port
Decommissioning
Development process
Port facilities
Jobscape
Career diagnostic
Contact
Welcome to the Offshore Wind Development Pathway Ireland guide. Its purpose is to inform about the wind farm projects off the Irish coast, and to provide opportunities for people looking to work in this growing sector.
Click here to learn more
Interactive Guide
Lifecycle phases
3
Development and project management
3
1 Development and project management
1.1 Development and consenting services
1.2 Environmental surveys
1.3 Resource and metocean assessment
1.4 Geological and hydrological surveys
1.5 Engineering and consultancy
1.6 Project management
Manufacturing
3
2 Manufacturing
2.1 Wind turbine
2.1.1 Turbine nacelle and hub
2.1.2 Turbine blades
2.1.3 Turbine tower
2.1.4 Turbine electrical system
2.2 Cables
2.2.1 Array cables
2.2.2 Export cables
2.3 Fixed foundation
2.4 Floating foundation
2.5 Mooring system (floating only)
2.6 Offshore substation
2.7 Onshore substation
Installation
3
3 Installation
3.1 Offshore substation
3.2 Offshore cables
3.3 Onshore export cables
3.4 Mooring system (floating only)
3.5 Turbine and foundation installation
3.6 Inbound transport
3.7 Construction port
3.8 Offshore logistics
3.9 Onshore substation
Operations and maintenance
3
4 Operations and maintenance
4.1 Operations
4.2 Maintenanace
4.3 Major repair
4.4 Offshore vessels and logistics
4.5 OMS port
Decommissioning
Development process
Port facilities
Jobscape
Career diagnostic
Contact